3 weeks project. Installed new doors, insulated roof and walls, installed new skylight window, shower enclosure with variable shower head, contemporary basin and toilet, mirror, bespoke shelf across the wall, installed lights, all fixtures and fittings, wall and floor t...
more..
2 weeks project. Redecorated walls and ceiling, removed old and installed new shower enclosure with electric shower and variable head, pedestal basin, toilet and bath with shower mixer tap, shower connected to “Saniflo” system, installed new mirror, all fixtures and fit...
more..
8 days project. Redecorated walls and ceiling, removed old and installed new shower enclosure, pedestal basin, bath with electric shower and variable head, bath screen, anti-fog mirror, all fixtures and fittings, floor tiles....
more..
2 weeks project. Removed old and installed new shower enclosure with tray and wall mounted shower mixer tap, new corner bath with wall mounted shower mixer tap, wall and floor tiling, under floor heating....
more..
2 week project. Redecorated walls and ceiling, removed old and installed new shower enclosure with built-in valve and rigid shower head, cupboard with worktop and built-in basin , toilet, installed new mirror, light fittings, all fixtures and fittings, linoleum flooring...
more..
2 weeks project. Redecorated walls and ceiling, removed old and installed new shower enclosure with built in tray, built-in valves with ceiling mounted rigid head and wall mounted variable head, built-in rest bench and wall built-in void, installed moisture resistant do...
more..
2 weeks project. Redecorated walls and ceiling, removed old and installed new bath, built-in valve and tap with rigid shower head, bath curtain, two cupboards and drawer unit with Corian worktop and two built-in basins, installed new mirror, toilet, all fixtures and fit...
more..